- Look beyond the default option.
Many stakeholders in the development world rely on local gas utilities when evaluating and marketing industrial sites. This strategy can work. It can also unintentionally eliminate sites that are otherwise ideal for development. Failing to consider a direct connection to nearby interstate transmission pipelines could be a costly mistake. A utility’s evaluation must consider how the new plant will impact hundreds or thousands of other customers on their system. And, at times, the new facility may be deprioritized for the benefit of other customers. Connecting directly to an interstate pipeline offers your new project access to a dedicated system, which is less complex and provides less risk of being deprioritized.
What options are available if a site is a strong candidate but lacks adequate natural gas service? If a potential site has access to both options, carefully evaluate and understand the benefits and challenges of each. For a large gas user, access to an interstate pipeline will likely have significant long-term advantages and may be accessible for no additional CAPEX from the customer. - Understand “basis” differentials and how to access advantaged natural gas.
Natural gas trades at different prices in different parts of the world. “Basis” commonly refers to the price differential between the U.S. benchmark (Henry Hub), and the local cost of gas at a specific location. Common drivers for this difference are local production economics, regional demand, transportation costs, and pipeline capacity. For example, in a prolific production basin like the Marcellus/Utica, which also has limited pipeline takeaway capacity, the local prices face downward pressure and trade at a discount to Henry Hub. The state you are considering for development could have multiple interstate pipelines — each with a different basis. As part of your search, you will want to explore which pipeline is currently advantaged…and why.
Failing to consider a direct connection to nearby interstate transmission pipelines could be a costly mistake.
- Validate capacity and ability to execute extensions/interconnects.
“The gas line is only a mile away.” That sounds convenient, but what if the pipeline operator is unmotivated to build a lateral to your site or it lacks the capacity to meet your energy needs. While well-intentioned, relying on superficial information can be a fatal mistake. You must work directly with the pipeline operator or midstream company if you plan to connect to an interstate pipeline. They can provide commitments on capacity and cost, estimate a timeline, and explain their abilities to execute new infrastructure. - Optimize the “Firm Transportation” (FT) strategy.
Undoubtedly, your board and investors will want guaranteed gas access for the plant, so acquiring Firm Transportation (FT) capacity may be critical. FT can be tricky. Some markets are liquid and have ample unsubscribed FT. If this is the case, the plant may be able to shed some or all the FT commitments after the plant is operational. Routinely right-sizing the FT portfolio, while carefully weighing risk, could result in major savings.
Location Factors for a Large Natural Gas User
By following the four strategies outlined below, the location team for a natural gas user can uncover more potential sites, reduce costs, and enhance competitiveness.
Q1 2023
Project Announcements
Canada-Based Opsun Corporation Plans High Point, North Carolina, Manufacturing Operations
04/20/2025
BWXT Plans Oak Ridge, Tennessee, Manufacturing Operations
04/20/2025
Lucid Group Plans Phoenix-Coolidge, Arizona, Manufacturing Operations
04/19/2025
Hitachi Energy Expands Westmoreland County, Pennsylvania, Manufacturing Operations
04/09/2025
Denmark-Based Primo Plans Mobile, Alabama, Production Operations
04/07/2025
APA Solar Plans Bryan-Ridgeville Corners, Ohio, Operations
04/03/2025
Most Read
-
Run a Job Task Analysis
Q4 2024
-
The Location Economics of Advanced Nuclear
Q1 2025
-
39th Annual Corporate & 21st Annual Consultants Surveys: What Business Leaders and Consultants Are Saying About Site Selection
Q1 2025
-
NEW NIMBYism: A Threat to The U.S. Economy
Q4 2024
-
Why Workforce Readiness Can’t Wait
Q1 2025
-
Power, Policy, and Site Selection in 2025
Q1 2025
-
Forging Solid Foundations
Q1 2025