Netherlands-Based Falk Production Expands Walker, Michigan, Operations
10/13/2023
The project is being supported by a $270,000 Michigan Business Development Program performance-based grant. In addition the City of Grand Rapids is working to facilitate an Industrial Facilities Tax Abatement (PA 198). The Michigan Economic Development Corporation (MEDC) also authorized a State Education Tax Abatement to be used in conjunction with the locally approved abatement.
“Headquartered in the Netherlands, Falk Panel initially worked with The Right Place back in 2018 to establish their first North American operations right here in Walker,” noted Brent Case, Vice President of Business Attraction of The Right Place, and the lead on this project. “We’re thrilled to see the significant growth they’ve had over the past five years and happy that they’ve chosen to continue their expansion and investment in our region.”
Falk Production produces insulated metal building panels for use in building, roof, cold storage, and wall construction projects. Netherlands-based FALK Bouwsystemen B.V. is a manufacturer of sandwich panels for roofs, walls and façades.
Project Announcements
Sun Pharmaceuticals Plans Princeton, New Jersey, Headquarters
03/18/2025
Engineered Foam Packaging Expands Bishopville, South Carolina, Operations
03/18/2025
Space Exploration Technologies Corporation Expands Bastrop, Texas, Operations
03/16/2025
Ralliant Corporation Plans Raleigh, North Carolina, Global Headquarters
03/16/2025
CG Model Tek Expands Coffee County, Tennessee, Manufacturing Operations
03/16/2025
TST Fabrication and Machine Expands Norfolk, Virginia, Headquarters-Operations
03/16/2025
Most Read
-
NEW NIMBYism: A Threat to The U.S. Economy
Q4 2024
-
Power, Policy, and Site Selection in 2025
Q1 2025
-
Designing Beyond the Assembly Line
Q1 2025
-
Forging Solid Foundations
Q1 2025
-
Industries Look for Employees in Nontraditional Spaces Amid Labor Shortage
Q4 2024
-
What to Make of the Rising Trend of Salary Transparency in Job Descriptions
Q4 2024
-
Why Decarbonization Goals Start with Site Selection
Q4 2024