Mercury Systems Opens Advanced Microelectronics Center of Excellence in Phoenix, Arizona
10/22/2017
The Company’s new AMC facility is a high-tech, 115,000 square foot design and manufacturing center of excellence for advanced digital microelectronic solutions addressing the defense industry’s most rigorous performance and quality standards.
According to company officials, with 15,000 sq. ft. of class 100k clean room space, the facility manufactures embedded processing modules, high-density secure memory, military-grade solid-state storage and custom built-to-specification microelectronics. All products built in the new center are integrated by customers into highly sophisticated computing systems which are then deployed in a variety of military applications such as electronic warfare, radar, platform management and command, control, communications and intelligence.
“Our Phoenix AMC is now delivering digital processing and storage innovations that perfectly complement the RF and microwave capabilities of our existing centers in West Caldwell, N.J. and Hudson, N.H.,” said Mark Aslett, Mercury’s President & CEO. “For the first time, defense prime contractors now have a secure and trusted supplier of digital microelectronics from a Defense Microelectronics Activity (DMEA)-accredited facility for design, assembly, test and broker services.”
To ensure a seamless and rapid transition from prototype sampling to full-rate production, engineering resources skilled in advanced design and simulation techniques are co-located within the AMC, officials explained. Recognizing the importance of long-term supply continuity for prime contractors, supply chain security and trust are assured throughout the complete product lifecycle.
As a testament to its steadfast commitment to all aspects of industrial security, design and manufacturing records are actively protected with a cybersecurity program modeled after the Center for Internet Security (CIS) critical security controls.
“The expansion of this Advanced Microelectronics Center further reinforces Arizona’s commitment to driving economic growth and prosperity through the creation of sustainable, high-quality jobs,” said Congressman Ruben Gallego. “I congratulate the team at Mercury Systems for this truly impressive facility, and I am proud of the Arizona citizens now supporting our military forces with trusted defense microelectronics.”
Mercury’s Advanced Microelectronics Centers are a key component for the realization of the Company’s next-generation business model. Through affordable and highly differentiated sensor chain solutions, defense prime contractors can simultaneously secure their supply chain operations, minimize technical risk and meet program schedule and budget demands.
Project Announcements
Siemens Energy Plans Fort Payne, Alabama, Manufacturing Operations
02/09/2026
Preciball USA Plans Screven County, Georgia, Production Operations
02/09/2026
Mecad USA Plans Tulsa Port of Catoosa, Oklahoma, Manufacturing Campus
02/08/2026
Anduril Industries Plans Long Beach-Lakewood, California, Operations
02/08/2026
Dongwon Autopart Technology Plans Emanuel County, Georgia, Production Operations
02/07/2026
Quantum Machines Plans Chicago, Illinois, Operations
02/06/2026
Most Read
-
Top States for Doing Business in 2024: A Continued Legacy of Excellence
Q3 2024
-
Data Centers in 2025: When Power Became the Gatekeeper
Q4 2025
-
Speed Built In—The Real Differentiator for 2026 Site Selection Projects
Q1 2026
-
Preparing for the Next USMCA Shake-Up
Q4 2025
-
Tariff Shockwaves Hit the Industrial Sector
Q4 2025
-
The New Industrial Revolution in Biotech
Q4 2025
-
Strategic Industries at the Crossroads: Defense, Aerospace, and Maritime Enter 2026
Q1 2026