35th Annual Survey of Corporate Executives Commentary: Change in Site Selection Priorities and Plans Over the Short and Long Term
Training programs and quality of life are two factors that have seen a jump in importance over the 35-year course of the Corporate Survey; as of now, however, some short-term facility plans have been put on hold.
Q1 2021
New investments are currently mainly been done for manufacturing facilities and warehouses (representing 52 percent of the domestic total and 41 percent of the foreign total of planned new plants). Due to the electrification of vehicles, the auto industry is seeing large manufacturing projects. President Biden’s plan to make all government vehicles electric — more than 645,000 cars and trucks — would push production of EVs even more.
With regard to site selection factors, the survey clearly shows the availability of skilled labor as the No. 1 criteria with a 91.4 percent importance rating. Training programs have become increasingly important to companies (with a 50.9 percent importance rating in 1986 to 63.3 percent nowadays). Labor costs dropped to 84.2 percent from being the top factor with 96.6 percent importance rating 35 years ago.
As the survey shows, a site “certification” is not a main decision factor for companies — 69 percent of the respondents say that a pre-certified site is of no importance or equal to other parameters. Although still important, survey numbers for highway accessibility and accessibility to major airport have dropped over 35 years, which means that rural areas are becoming more popular in which to locate new facilities. In particular, larger projects are choosing smaller cities with a good quality of life standard to attract employees rather than metropolitan areas. The quality of life factor saw a huge increase in importance — going from a 60.4 percent importance rating 35 years ago to 84.8 percent today.
Quality of life is becoming a very important criteria in the site selection process. Nowadays many companies list quality of life as a main decision parameter besides labor, utilities, transportation, and incentives.
Recent Project Announcements
Oobotic Plans Melbourne, Arkansas, Operations
07/07/2026
Curtiss-Wright Expands Cheswick, Pennsylvania, Manufacturing Operations
07/07/2026
Germany-Based Blackwave Plans San Antonio, Texas, Manufacturing Operations
07/06/2026
Edible Garden AG Upgrades Webster City, Iowa, Operations
07/05/2026
ADM Upgrades Decatur, Illinois, Operations
07/05/2026
Prime Beverage Group Plans Shelby County, Indiana, Production Operations
07/05/2026
MMY US Plans Cleveland, Ohio, Manufacturing Operations
07/04/2026
Orion Edge Group Expands Tampa, Florida, Operations
07/03/2026
Auto Parts Manufacturing Mississippi Expands Lee County, Mississippi, Production Operations
07/03/2026
Germany-Based Goldhofer Plans Hickory, North Carolina, Production Operations
07/03/2026
Rural King Plans Henry County, Virginia, Distribution Operations
07/02/2026
ANS Plans Columbus, Ohio, Headquarters Operations
07/02/2026
Hybar Expands Osceola, Arkansas, Operations
06/30/2026
South Korea-Based Sam Dong Expands Delaware, Ohio, Production Operations
06/30/2026
Most Read
-
Rethinking Environmental Review
Q2 2026
-
21st Annual Shovel Awards: The American Industrial Economy Remade in Real Time
Q2 2026
-
Where Early-Stage Life Sciences Companies Get Stuck Scaling Their Real Estate—and How to Move Forward
Q2 2026
-
Avoid These Red Flags, Deal Killers, and Blunders in Site Selection
Q2 2026
-
2025’s Top States for Business: How the Winners Are Outpacing the Rest
Q3 2025
-
The Missing Middle: Pre-Commercial Life Science Companies and the Incentives Gap Impacting Future Clusters
Q2 2026
-
What Korean Manufacturers Underestimate About Building in America
Q2 2026