Sunrise Powerlink Begins Building 117-mile California Transmission Line
12/10/2010
"The construction of the Sunrise Powerlink is a huge win for the people of California," said Governor Arnold Schwarzenegger. "This transmission line opens the door for additional green investments and job creation in the Imperial Valley, while helping us meet our renewable energy and greenhouse gas reduction goals and improving the reliability of our power grid. It is these types of big, bold projects California needs to transition to a clean energy future."
The project is expected to generate ancillary renewable energy projects in the solar, wind, and geothermal sectors in the Imperial Valley. The line will enter service in 2012. The state of California aims to use 33 percent clean power as part of renewable energy goals.
Project Announcements
American Pacific Corporation Expands Iron County, Utah, Production Operations
09/15/2025
Swiss-Based Stadler Expands Salt Lake City, Utah, Operations
09/15/2025
South Korea-Based PPI America Plans Iron County, Utah, Manufacturing Operations
09/15/2025
Apozeal Pharmaceuticals Expands Bucks County, Pennsylvania, Drug Manufacturing Operations
09/14/2025
Georgia-Pacific Expands Monroe County, Alabama, Cellulose Mill Operations
09/14/2025
Noble Plastics Expands St. Landry Parish, Louisiana, Production Operations
09/14/2025
Most Read
-
Tariffs, Talent, and U.S. Expansion
Q3 2025
-
What We’re Getting Wrong About Gen Z’s Future in the Skilled Trades
Q3 2025
-
Data Center Demand Stabilizes Amid Changing Market Forces
Q3 2025
-
Powering the Next Generation of Projects
Q3 2025
-
How Consumer Trends Are Reshaping Food Facilities
Q3 2025
-
A New Course for U.S. Shipbuilding
Q3 2025
-
Optimizing Your Rail-Served Transportation Network: Strategy Before Steel
Q2 2025