American Wind Energy Association Annual Wind Industry Report (2008)
4-29-2009
A stable governmental policy environment will help to encourage investment in wind equipment production facilities. In the past two years alone, wind turbine and turbine component manufacturers located or expanded 70+ facilities in the United States. The American Recovery and Reinvestment Act, which was signed into law by President Obama on Feb. 17, 2009, includes a three-year extension of the production tax credit (PTC) as well as a new program that allows renewable energy developers to forego the PTC and instead secure a Treasury grant equal to 30 percent of the investment tax credit (itc).
Project Announcements
Qblox Plans Canton, Massachusetts, Operations
04/14/2026
Lumentum Holdings Plans Greensboro, North Carolina, Production Operations
04/14/2026
Mars Snacking Expands Chicago, Illinois, Headquarters Operations
04/14/2026
Japan-Based FANUC America Expands Auburn Hills, Michigan, Manufacturing Operations
04/13/2026
Pulmuone Foods USA Expands Ayer, Massachusetts, Production Operations
04/13/2026
HF Rubber Expands Topeka, Kansas, Production Operations
04/12/2026
Most Read
-
Economic Developer Role Shifting from Deal-Making to Systems Stewardship
Q1 2026
-
What Companies Need from Modern Manufacturing Sites
Q1 2026
-
Top States for Doing Business in 2024: A Continued Legacy of Excellence
Q3 2024
-
Capitalizing on the OBBBA Before the 2026 Cliff
Q1 2026
-
Last Word: Don’t Lose by Winning
Q1 2026
-
Advanced Manufacturing Isn’t a Buzzword—It’s a Different Location Strategy
Q1 2026
-
40th Annual Corporate and 22nd Annual Consultant Site Selection Survey Results
Q1 2026