Beyond Green Identifies Data Center-Semiconductor Manufacturing Properties in Idaho
03/11/2019
According to company officials, the 670 acres can support numerous 500,000+ square-foot mission-critical data center projects, as well as semiconductor manufacturing and smaller technology projects and general industrial.
“With data center demand by hyperscale companies and cloud computing rising, we believe the need for mission-critical data center and semiconductor manufacturing space will grow rapidly in the years to come. For prospective data center and semiconductor manufacturing end users, the Beyond Green properties in Post Falls and Rathdrum will provide outstanding economic development incentives, low power and water costs, and the ability to design and build a data center and semiconductor manufacturing facilities to suit specific needs,” said Gerald Dicker, CEO & President, Beyond Green, Inc.
Working in conjunction with two separate utilities as the energy providers, the area boasts some of the lowest power costs in the country, company officials said. At under 4.00 cents per kWh, with an estimated PUE of 1.30 or lower, the energy cost is considerably lower than the industry standard of 1.35. The properties have over 4 million gallons of water per day (4 MGD+) available for manufacturing and cooling, as well as other commercial uses.
Carrier neutral connectivity capable of redundant pathways can be provided from Qwest, Level 3, AT&T, Zayo and Fat Beam.
Both the Post Falls and Rathdrum sites are within City limits, have access to municipal sewer and water and are appropriately zoned Technology and Industrial. Substantial economic incentives are also available, including real estate tax deferrals to fund infrastructure. Idaho is a business-friendly State with a “can do” spirit of collaborative cooperation.
Located 15 minutes from the Spokane, Washington metropolitan area, the Post Falls and Rathdrum sites are uniquely positioned minutes from Interstate 90, the most significant transportation corridor across Washington, Idaho and all points east, as well as the Spokane International Airport, Beyond Green officials said.
Project Announcements
Eli Lilly Expands Research Triangle Park, North Carolina, Operations
01/26/2023
Nestlé Health Science Expands Eau Claire, Wisconsin, Production Plant
01/26/2023
Milo's Tea Company Plans Plans Moore, South Carolina, Production Plant
01/25/2023
Liberation Labs Establishes Richmond, Indiana, Biomanufacturing Facility
01/25/2023
Biomerics Expands Monroe, Connecticut, Headquarters-Operations Campus
01/23/2023
Amazon Web Services Plans Virginia Data Center Campuses
01/23/2023
Most Read
-
2022 Top States for Doing Business Provide an Environment for Business Growth
Q3 2022
-
Three Big Challenges Facing the Food & Beverage Industry
Q4 2022
-
Location Factors in the EV Industry — “Mission Critical” or “Nice to Have”?
2022 Auto/Aero Site Guide
-
Innovation Corridors Update
Q4 2022
-
Food Processors’ Optimal Location Decision
Q4 2022
-
36th Annual Corporate Survey: Executives Focus on Labor, Energy, Shipping Costs
Q1 2022
-
Fixing the Supply Chain with AI and Robotics
Q4 2022